My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE112462
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE112462
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:08:48 PM
Creation date
11/24/2007 9:32:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991146
IBM Index Class Name
Permit File
Doc Date
5/10/1999
Doc Name
ZMK GRAVEL PIT PN M-91-146 ENCLOSED BOND RECALCULATION
From
DMG
To
MONADNOCK MINERAL SERVICES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />HOURLY PRODUCTION cont'd <br />_____________________ <br />_____________________ <br />Loader Cycle Time cont'd <br />Rolling Resistance <br />__________________ <br />Roadway underfooting conditions: <br />Haul Loose sand or gravel <br />Return: Loose sand or gravel <br />Haul 8 Return Time grade rolling <br />------------------ length res. res. <br />(ft) (X) (X) <br />Haul route 500 2.00 10.00 <br />Return route: 500 -2.00 10.00 <br /> <br />sheet 2 of 2 <br />total trove( <br />res. time <br />(X) <br />--------- (min) <br />---------- <br />12.00 0.842 (CAT HB) <br />8.00 0.477 (CAT HB) <br />Total travel time 1.318 <br />Total cycle time 1.778 minutes <br />Loader Bucket Capacity <br />______________________ <br />Rated Capacity 2.25 LCY (heaped) (CAT HB) <br />Bucket fill factor 0.975 Loose mat.-moist mixed aggregates(95 -100X) <br />Adjusted capacity 2.19 LCY <br />Job Condition Correction Factors <br />Site attitude 7,180 feet <br />Altitude correction factor 1.00 (CAT HB) <br />Job efficiency factor 0.83 (1sh/day) <br />Net correction 0.83 multiplier <br />Unadjusted hourly unit production 74.02 LCY/Hr <br />Adjusted hourly unit production 61.44 LCY/Hr (CAT HB) <br />Adjusted hourly fleet production 61.44 LCY/Hr <br />JOB COST <br />Fleet size 1 Loader(s) Total jab time 9.03 Hours <br />Unit cost 80.759 /LCY Total job cost 8421.03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.