My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE112462
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE112462
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:08:48 PM
Creation date
11/24/2007 9:32:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991146
IBM Index Class Name
Permit File
Doc Date
5/10/1999
Doc Name
ZMK GRAVEL PIT PN M-91-146 ENCLOSED BOND RECALCULATION
From
DMG
To
MONADNOCK MINERAL SERVICES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•C I R C E S Cost Estimating Software • sheet 1 of 2 <br />EARTHWORK <br />___________ <br />___________ FORM <br />_____ <br />_____ - WHEEL LOADER WORK <br />____________________ <br />____________________ <br />Agency or organization name DMG <br />Task # 03a State Colorado Permit # M-91-146 <br />Date 05/07/99 County Ouray Abbr. none <br />User SSS Si [e Zmk Gravel Pii Filename M146-03a <br />Permit/job action Routine Bond Recalculation <br />Task description Remove temporary crossing material <br />HOURLY EQUIPMENT COST <br />_____________________ Basic machine :CAT 926E (94)Horsepower 110 <br />-------------------- -______-_ <br />Attachment #1 :ROPS Cab Shift basis: 1/day <br />____________________ _________ <br />(CRG) <br />Cost Breakdown Ownership E/hour E9.68 <br />-------------- Operating E/hour E13.81 100 L utilization <br />Operator E/hour E23.12 <br />Total unit E/hour: E46.61 Total fleet cost/hr E46.61 <br />MATERIAL QUANTITIES <br />_____________________ <br />_____________________ <br />Initial Swell Final <br />volume 555 LCY factor NA volume 555 LCY <br />Quantity source/reference Assume 100'L x 15'W x 10'H <br />X Swell source/reference NA <br />HOURLY PRODUCTION <br />Loader Cycle Time <br />Unadjusted basic cycle time (load, dung 8 maneuver) 0-470 min. <br /> (CAT HB) <br />Cycle Time Factors Factor (min.) <br />Type of material Mixed material 0.020 (CAT HB) <br />Type of stockpile Conveyor or dozer piled 10 ft. high or 0.010 (CAT HB) <br />Truck ownership No adjustment - factor not applicable 0.000 (CAT HB) <br />Type of operation Constant operation -0.040 (CAT H8) <br />Type of dunq~ target: Nominal target 0.000 (CAT HB) <br /> Net cycle time adjustment -0.010 min. <br /> Adjusted basic cycle time 0.460 min. <br />
The URL can be used to link to this page
Your browser does not support the video tag.