My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE112462
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE112462
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:08:48 PM
Creation date
11/24/2007 9:32:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991146
IBM Index Class Name
Permit File
Doc Date
5/10/1999
Doc Name
ZMK GRAVEL PIT PN M-91-146 ENCLOSED BOND RECALCULATION
From
DMG
To
MONADNOCK MINERAL SERVICES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
., RECLAMATION CO~UMMARY cont'd ~t 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.l Task Description ~ Cost (5) <br />________I_______,.___________________________________,.______I____,._______ <br />Subtotal (K): <br />____________ <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No.~ Task Description ~ Cost (5) <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (E) <br />Sa ~ DemolitionDispose of 5'x10'x10' mass aJ 50.22/c.f.~ 5110 <br />ba ~ Seeding Per attached worksheet ~ 51,474 <br />Fencing <br />7a ~ Mob/Demob Per attached worksheet ~ 5682 <br />Subtotal (M): 52,266 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 514, 133 <br />____ _______ <br />11. INDIRECT COSTS <br />________________________________________________________________ _______ <br />________________________________________________________________________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Cost (E) <br />___..____I______..________.__~_______________________________I____________ <br />1. ~ Public Liability Insurance.... 1.SSOX of dir. ~ 5219 <br />2. ~ Contractor's Performance Bond 1.550% of dir. ~ 5219 <br />3. ~ Contractor's Profit........... 10.007. of dir. ~ 51,413 <br />4. ~ Jo6 Superintendent..Equi p. oper. serves as super. <br />Subtotal (A): 51,851 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 515,984 <br />B. DMG PROJECT ADMINISTRATION E%PENSES <br />Item No.l Item Description Cost (5) <br />1. ~ Minerals Program Admin. Fee at 5.00% of cntr.~ 5799 <br />NET INDIRECT COST PERCENTAGE: 18.76% Subtotal (B ): E799 <br />__________ ____________ <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 52,651 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 516,784 <br />
The URL can be used to link to this page
Your browser does not support the video tag.