Laserfiche WebLink
RECLAMATION COS MMARY cont'd s• 3 of 4 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.l Task Description ~ Cost (E) <br />Subtotal (H): <br />____________ <br />1. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.l Task Description ~ Cost (E) <br />________I__________________________________________________I____~_______ <br />4a ~ Place rip rap on east bank. Assume 200 feet by ~ E624 <br />~ 37 feet approximately 2 feet thick. ~ <br />46 ~ Import 550 c.y. of rip rap for armoring the east ~ E9, 908 <br />bank. <br />Subtotal (I): 510,532 <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (E) <br />Subtotal (J): <br />