My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE112462
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE112462
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:08:48 PM
Creation date
11/24/2007 9:32:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991146
IBM Index Class Name
Permit File
Doc Date
5/10/1999
Doc Name
ZMK GRAVEL PIT PN M-91-146 ENCLOSED BOND RECALCULATION
From
DMG
To
MONADNOCK MINERAL SERVICES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EOUI PMENT: <br />------------------ Total Eqp. Fleet Size Haul Trip Return Trip <br />Machine Description Cost/hr (no. hauled) Cost/hr Costlhr <br />--------------------------------------------------------------------------------------------------- <br />---------------------------------------------------------------------------------------------------- <br />10 yd dump truck 552.03 1 852.03 882.03 <br />______________________________________________________________SUbtotals :________882.03 ________882.03 <br />MOB/DEMOB SUPPORT EOUI PMENT: --------- --------- <br />sheet 2 of 2 <br />--------------------------- Weight Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Non-Roadable Eqp. Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Cost/hr cost/ea <br />Subtotals 80.00 50.00 80.00 <br />Total Eqp. Fleet Size Haul Trip Return Trip <br />Roadable Eqp. Description Cost/hr (no, hauled) Cost/hr Cost/hr <br />Subtotals 80.00 80.00 <br />EDUI PMENT HAUL DISTANCE 8 TIME <br />Nearest major city or town within project area region: Ridgeway <br />Total one way travel distance = . 7.0 miles. Average travel speed = 35.00 mph. <br />- 0.50 <br />Job Time - Non Roadable Equip.- hours load Roadable E ui - <br />q p.- N/A hours load <br />0.20 hours haul 0.20 hours haul <br />0.50 hours unload N/A hours unload <br />0.20 hours return 0.20 hours return <br />JOB LOST <br />Total Mob/Demob Lost = 8682.24 <br />NOTE: Non-roadable equi Anent (haul rig required to transport) mob/demob costs based on 2 round trips, each trip <br />consisting of a one-way loaded haul and a one-way empty return. Roadable equipment (no haul rig required) <br />costs based an one round trip. Colorado DOT requires special permits far oversize equi Anent on certain <br />specified road segments within the State. Separate permits are required for each rig on each loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br />equi peen[ hauling, and loading/unloading times must be increased Substantially for equipment which must be <br />partially dismantled for transport and re-assembled at the job site. Costs for lifting equipment and other <br />support equi Anent needed for this work should be included in the mob/demob costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.