Laserfiche WebLink
<br />Colorado Division of Minerals and Geology Sheet 1 of 2 <br />ESTIMATING FORM - EQUIPMENT MOBiL12AT ION / DEMOBILIZATION <br />_________________________________________________________ <br />_________________________________________________________ <br />Task #... O7a Prep. by SSS Filename,.M146-07a <br />Date..... 10-May-99 Permit # M-91-146 Mine......Zmk Gravel Pit <br />Permit Ac[i on........ Routine Bond Recalculation <br />Task Description..... Transport equi Anent to/from site <br />HOURLY EGUI PMENT COST <br />_____________ ________ NOTE - This is a list to select from, not a List of mandatory items to incl ude. <br />Mob/Demob Eqp. -Tract or 6x4, 75,000 lb GVN, 375 HP, diesel powered <br /> -Lt. Trailer : 25 ton folding gooseneck, drop deck <br /> -Med. Trailer 50 ton folding gooseneck, drop deck <br /> -Hvy. Trailer 120 Ton folding gooseneck, drop deck <br /> -Pilot Car On-highway light duty truck, 4x2, 130 hp, 1 12 ton rating, gasoli ne powered <br /> -Hyd. Crane Grove RT58E rough terrain hydraulic crane, 20 ton capacity, 125 hp, 70 ft. boom <br /> -Fuel Truck 6x4, 3,600 gallon capacity, 210 HP, diesel powered <br /> -Cube Truck 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br /> -Flatbed Truck: 30,000 lb GW, 210 HP, diesel powered <br />Last Update: ________________________________ ___________ ______..______________ ___________ __________ <br />August, 1997 (trucks) <br />------------- -------- Lt. Rig Med.R ig Hvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: <=25 T. 26-50 T. > 50 T. Car Crane Truck Truck Truck <br />Ownership Cost/hr = E25.59 528.10 E31.38 E1.73 E24. 12 E6.88 512.66 E7.88 <br />Operating Cost/hr = E28.38 E30. 17 E32.34 E4.82 E31.48 E19.57 525.56 E11.82 <br />Operator Cost/hr = 522.61 E22.61 E22.61 521.82 E23.13 522.35 E21.24 E22.35 <br />Helper Cost/hr = 521.82 E21.82 E21.82 E0.00 E0.00 E0.00 E0.00 E0.00 <br /> Total = E98.40 E102.70 E108. 15 E28.37 E78.73 E48.80 E59.46 E42.05 <br />NON-ROADABLE EQUIPMENT: <br />---------------------- Weight Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Machine Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Cost/hr Cost/ea <br />-------------------------- <br />CAT 926E ------------- <br />10.45 ----------- <br />59.68 ------------ <br />598.40 --------------------------- <br />1 E108.08 -------------------------- <br />E98.40 <br />CRT D7H 26.80 E31.30 E102.70 1 E134.00 8102.70 <br />Subtotals E242.08 E201.10 E0.00 <br />