Laserfiche WebLink
scoop will pick up the broken coal and load it into a <br />feeder-breaker, from which the coal will be transported outside <br />on a 36" conveyor belt. A roof bolter will also be used in the <br />conventional section to support the roof. <br />The following production schedule is maximum for the 5 year <br />permit term: <br />YEAR Raton Creek No.l Mine Raton Creek No.2 Mine TOTAL PROD <br />RAW CLEAN REFUSE <br />TONS TONS TONS <br /><000) (000> (000) <br /> <br />RAW CLEAN REFUSE <br />TONS TONS TONS <br />(000) (000) (000) <br />RAW CLEAN REFUSE <br />TONS TONS TONS <br />(000) (000) (000) <br />1987 150 100 50 O O 0 150 100 50 <br />1988 442 295 147 158 105 53 600 400 200 <br />1989 442 295 147 158 105 53 600 400 200 <br />1990 600 400 200 O O 0 600 400 200 <br />1991 600 400 200 O 0 0 600 400 200 <br />1992 250 167 83 O 0 0 250 167 83 <br />TOTALS 2484 1657 827 316 210 SOb 2800 -1867 933 <br />As can be seen from the above table, refuse from the preparation <br />plant is expected to be 33X of the raw coal mined. This number <br />will fluctuate depending on seam quality. mining conditions, and <br />equipment settings within the plan. <br />Revised 5/93 <br />344 <br />