My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE112401
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE112401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:08:46 PM
Creation date
11/24/2007 9:27:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984014
IBM Index Class Name
Permit File
Doc Date
1/30/1984
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />C <br /> <br /> <br />MSNING PLAN <br />Surface Facilities <br />'HIBIT D <br />The 'surface facilities will be located on the Cotter own d,DOagy <br />No. 2 Claim and will consist of two buildings, one (80 x 40' x 18') <br />which houses the shop, warehouse, change room and office. <br />a 10' x 18' x 8' building, will house the compressor. The <br />station, ore pile and waste dump will be in close proximity <br />surface buildings. <br />Potable water for the mine will be hauled by truck and <br />distributed to the building through a Colorado State Departs <br />Health approved system. Sewage and waste water will be di s, <br />through a septic tank and leach field approved by the State <br />of Xealth. <br />other, <br />sformE <br />the <br />I be <br />of <br />d of <br />All refuse and solid waste which cannot be disposed of b .burning <br />will be buried within the claim boundaries. The trash burnin wi1Z be <br />done with the approval of the Montrose County Commissioners w th noti- <br />fication being given to the Montrose Sheriff's-Department and the <br />Bureau of Land Management, Montrose, Colorado, of the time an date <br />prior to any burning. <br />San Miguel Power Company will provide power to the 800 K <br />station at 28,800 volts where it will be transformed down to <br />for surface and 440 volts for underground. <br />Development <br />Entry to the JD-8 ore body will be through a pre-exi <br />-1- <br />sub- <br />?,300 volts <br />r adit <br />
The URL can be used to link to this page
Your browser does not support the video tag.