Laserfiche WebLink
IT E <br />PLAN <br />r1 <br />LJ <br />• <br />Compliance With Reclamation Performance Standards <br />Grading will be conducted to create final contours <br />with the surrounding topography which will be appropriz <br />lamation plan and the final Iand use. The gradinc will <br />to control erosion and siltation and to protect the sur <br />slides or other damage. Maximum slopes will be compa <br />existing surrounding topography and approximately a 2:1 <br />to vertical ratio. <br />3t blend <br />to the rec- <br />done <br />from <br />with <br />ri zon to 1 <br />All adits, ventholes or shafts will be plugged (see Exhi it E-1) <br />or sealed, either permanently or temporarily, depending pon the <br />decision of the Department of Energy. Backfilling and g ading <br />will be completed as soon as feasible after the mining i completed. <br />WATER <br />Cotter Corporation will comply with applicable fe <br />Colorado water Zaws and regulations as to water rights <br />quality (see Exhibit G). <br /> <br />The mining and reclamation plans will take into c <br />the safety and protection of wildlife on the mine site <br />roads. Cotter has contacted the Colorado Division of <br />the Bureau of Iand Management, and the Department of E <br />cerning the protection, rehabilitation and improvement <br />life habitat. <br />and <br />water <br />ideration <br />d access <br />dlife, <br />gy con- <br />' wild- <br />-2- <br />