Laserfiche WebLink
d~linor Revision No. 218 -Update Page 3 <br />November 7, 1997 <br />i <br /> <br /> <br />Area 1 I : Six (6) holes in Area 11 were completed. Three (3 j of the holes wire <br />completed as piezometers and the rest were abandoned. The drill road through Area <br />11 will remain to access the outlet of CSLY-4, inclinometer I-9 and piezometers, as <br />discussed in Area 10, and will also be reclaimed in the spring. <br />Area 12: Nine (9) holes in Area 12 were completed. All holes were abandoned. <br />except one which was completed as an inclinometer. All reclamation of this area is <br />complete. <br />Area 13: No drilling was completed in Area l3. Drilling has been postponed until <br />next year. <br />Area 14: Twelve (12) holes in Area 14 were completed. Four (4) of the holes were <br />completed as piezometers and the others were abandoned as approved. All of the <br />reclamation in this area has been completed. <br />Area 15: Two holes were proposed to be drilled in Area 1 ~. One of these holes has <br />been drilled and abandoned as approved. Access to the hole has been reclaimed. <br />The other hole will be drilled this year, but in a currently disturbed area; therefore, no <br />site reclamation, other than abandoning the hole, will be required. <br />Please call if you have any questions. <br />Sincerely, <br />cc: Kim Kaal <br />Eric Mende <br />Chris Nyikos <br />Phil Schmidt <br />Kathy Welt <br />mr218update.doc <br />