Laserfiche WebLink
Rex & Renata Replogle: Land use was addressed in the Delta County Specific Development <br />process. Geologic hazards are addressed by the Geotechnical Stability Analysis performed by <br />Revey Associate, Inc. Water is addressed above. <br />Dr. James Hudson: Land use was addressed in the Delta County Specific Development process. <br />Geologic hazards are addressed by the Geotechnical Stability Analysis performed by Revey <br />Associate, Inc. Water is addressed above. <br />In response to the State Engineer's request to identify the off site water right from which water will be <br />hauled for dust control on this site, the water right is known as North Delta Canal -Benson Brothers <br />Pump, Water Court case number 04CW 128. <br />Please let me know if there is any additional information that you need. 'T'hank you for your assistance in <br />this matter. <br />Sincerely, <br />G~~ <br />Michael Ripp <br />Consultant <br />