My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE112237
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE112237
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:08:38 PM
Creation date
11/24/2007 9:19:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
PR2 RULE 2.05 Operation and Reclamation Plans
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />RESPONSE: <br />Upon completion of topsoiling, the replaced topsoil will he seeded with <br />one of the approved seed mixtures. The mixtures can he found on Tables <br />8 and 13 (Rangeland Seed Mixture and Pastureland Seed Mixture, <br />respectively) of the permit renewal application for Permit C-81-071. <br />After seeding, the area will have contour furrows inscribed where <br />Safety requirements dictate such furrows can be inscribed. <br />The revegetation techniques will be the same as described in Permit <br />C-81-071. <br />ing and toxic- <br />materials constitut <br />that all <br />the contingency plans which have been developed to preclude sustained <br />on or sucn materia <br />RESPONSE: Refer to Permit Ilo. C-81-071 <br />r: <br />A de <br />quality laHS and regulations and health and safety standards, or a copy of <br />an approved permit or ap~licati.an for a permit_ <br />RESPONSE: Refer to Permit No. C-81-071 <br />Rule 2_05.5 - Post-mining__Land Uses <br />Surface Coal Mining Activities <br />Each plan shall contain a detailed narrative of the <br />sed <br />accordance Hith the land use categories established in the narrative, the <br />lp an shall include a discussion of the utility and capacity of the reclaimed <br />land to sup~rt a variety of alternative uses, and tire relationship of the <br />proposed use to ex_is_ting_ land_ use policies and plans. This description <br />shall explain: <br />fiL_How the Dr•oposed post-mining land use is to be achieved <br />and the necessary support activities which may be needed to achieve the <br />proposed land use;_ <br />is pro op sed, all materials needed for _approval of the alternative use unde~ <br />• 4.16; and <br />TR89-24 - 56 - Revised 03/01/89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.