Laserfiche WebLink
Sd)~A lan for removal from storage_ and redistribution of topsoil, <br />• subsoil and other material to meet_the_requirements of 4.06. <br />RESPONSE: <br />For the channel repair areas, the topsoil that fias been <br />the side of the access corridor and work areas will b <br />the respective areas. In the event that the topsoil ha <br />a temporary stockpile it will be picked up and replaced <br />The amount of topsoil associated with each repair area i <br />Area Volume (YD3) <br />windrowed along <br />e replaced over <br />d been placed in <br />over the area. <br />s as follows: <br />7 21,780 <br />31 26,620 <br />41 50,820 <br />51 24,200 <br />S1W 14,520 <br />It should be noted that the above represents a worst case topsoil <br />salvage and replacement quantity. It is based on a 200 foot wide <br />access corridor and work area. The actual disturbance may be less than <br />this amount. <br />Concerning the Area 61 final grading, some topsoil may require <br />temporary movement to allow maneuvering of equipment. This topsoil <br />will be reapplied over the area once spoil blending is complete. <br />• <br />includina_ but not limited to. description of <br />to be used; <br />(i) Schedule of revegetation; <br />Sii L pecies and amounts per acre of seeds and seedlings <br />iiii Methods to be used in planting and seeding; <br />iv) Mulching technique s;_ <br />~___Irrigation, if appropriate,_and pest and disease <br />control measures, if any;_ <br />success of revegetation in <br />i 4.15.7; and <br />tion of the results of <br />soi <br />• TR89-24 - 55 - <br />Revised 03/01/89 <br />