My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE112237
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE112237
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:08:38 PM
Creation date
11/24/2007 9:19:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
PR2 RULE 2.05 Operation and Reclamation Plans
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• WORK REQUIREMENTS: <br />I. Area 7 <br />A. Site Preparation <br />1. Topsoil Removal -Assumptions: <br />a) Nine acres require topsoil salvage (21,780/yd3) <br />b) Same assumption as in Production Estimates <br />9 acres x 43,560ft2/ac x 1.5' deep = 21,780 yd3 <br />27ft3 <br />2. Spoil Grading - Nine acres <br />B. Riprap and Bedding Haul and Placement <br />1. Riprap - 1,125 yd3 <br />2. Bedding - 435 yd3 <br />C. Reclamation <br />1. Spoil Grade - Nine acres <br />2. Topsoil Redistribution - 21,780 yd3 <br />3. Revegetation - Nine acres <br />• II. Area 31-1 and 31-2 <br />A. Site Freparation <br />1. Topsoil Removal <br />a. 11 acres require topsoil salvage (26,620 yd3) <br />b. Use same assumptions as in Production estimates <br />11 acres x 43,560ft2/ac x 1.5' deep = 26,620 yd3 <br />27ft3 <br />2. Spoil Grading - 11 acres <br />B. Riprap and bedding haul and placement <br />1. Riprap - 2,435yd3 <br />2. Bedding - 955 yd3 <br />C. Reclamation <br />1. Spoil grading - 11 acres <br />2. Topsoil redistribution - 26,620yd3 <br />3. Revegetation - 11 acres <br />• <br />- 43 - Revised 05/26/87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.