My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE112211
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE112211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:08:37 PM
Creation date
11/24/2007 9:18:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
start 2.04-22 end pg 2.05.26
Section_Exhibit Name
Rule 2 (rest of Sec. 2.04 to 2.25
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 continuous miner <br />• 2 shuttle cars <br />1 roof bolter <br />1 ratio feeder <br />1 power center <br />1 unitrac <br />1 conveyor belt <br />A continuous miner section is generally staffed by 9 to 10 people per <br />shift. <br />Longwall mining section <br />The operating plan also includes a Longwall mining section which con- <br />sists of a Longwall shearer to cut the coal. The Longwall shearer travels <br />• along and loads the coal on an armored face conveyor. The armored face <br />conveyor runs the length of the face and discharges the coal onto a stage <br />loader, which dumps the coal onto the conveyor belt. The roof is supported <br />in the working area by two leg shield supports. The whole system is self- <br />advancing through the use of hydraulic rams, and is staffed by approxima- <br />tely 10 men per shift. The balance of the mine labor is used in support <br />work, transporting materials, constructing ventilation structures, doing <br />supplemental roof support, cleaning, maintaining and repairing conveyors, <br />laying track, etc. Past 1985 the operating plan will be essentially the <br />plan for the E Seam, except that it will take place in the Wild and D <br />Seams. <br />Production will not exceed 1.5 million tons per year in the East and <br />• <br />West Portals separately. It is extremely unlikely that both mines will <br />2.05-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.