Laserfiche WebLink
i • <br />CANON DOLOMITE QUARRY <br />EXHIBIT E - RECLAMATION PLAN <br />Phase I - Depleted Upper Quarry Site <br />Reclamation will begin with the revegetation of the depleted upper <br />quarry site in about two years. <br />First, some minor grading will be done to smooth out the rough spots <br />on the slope. The fertilization will be done prior to seeding. This will <br />be accomplished with 50 lbs/acre of nitrogen, 400 lbs/acre of phosphorus <br />(in the form triple super phosphorus) and 60 lbs of potassium (in the <br />form of KZO). The potassium and phosphorus will be mixed into the <br />upper 6 to 10 inches of the soil. <br />After fertilization has been completed, the upper quarry site will <br />be seeded with the following species mixtures: <br />Grasses <br />Slender Wheatgrass <br />Critana Thickspike ~rJheatgrass <br />Green Needlegrass <br />Russian Wildrye <br />Regar Meadow Brome <br />Paloma Indian Ricegrass <br />Forbs <br />Lutana Cicer Milkvetch <br />Lewis Flax <br />Palmer Penstemon <br />Emerald Crownvetch <br />Small Burnet <br />Shrubs <br />Fourwing Saltbush <br />Winterfat <br />Pounds of Pure Live <br />Seed Per Acre <br />1 <br />2 <br />2 <br />1 <br />2 <br />1.5 <br />1.5 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />Total 16 lbs/acre <br /> <br />~. <br />,C <br />~° , <br />i I.. ~.~, <br />~ . <br /> <br />