Laserfiche WebLink
<br />BBCLANATION C09t 9UNNABT cont'd skeet 4 of 4 <br />B. PORTAL/SHAFT SBALINC <br />Task No.; Rask Description Cost (fi <br />• N/A . ; No portal or shaft sealing work required f0 <br />, , <br />, <br />Subtotal (H1: f0 <br />L. DRILL NOLB/NONITOBING NSLL SBALINC <br />Task No.; Task Description ; Cost (f) <br />N/A ' No son. well sealing work incl. in this estivate ; !0 <br />........I ............................................................... <br />Subtotal (L-: f0 <br />N. NI9CBLLANBOUS BBCLANATION TASHS <br />Task No.; Task Description Coet (fl <br />N/d ' ! Structural Deaalitian (total frog worksheet! ! !0 <br />4 flevegetation (total ftov xotksheetl ; 46,640 <br />N/A ;Fencing (total frog worksheet) f0 <br />5 ; Mobilization/Deaoh. (total-fto~ worksheet) ; 42,472 <br />• Subtotal (N-: 49,112 <br />------------ <br />TOTAL DIBBCT BBCLANATION COSTS (subtotals A through N): !19,078 <br />II. INDIBBCT COSTS <br />A. CONTBACTOB'9 OVBBHBAD d PBOFIT <br />Iteu No.; Itea Description ; Coet (SI <br />1. ; Public Liability Inautaace,.. 1,550% of dir. 4296 <br />2. Contractor's Perforaaace Bond 0.975% of dir. !186 <br />3, Coatrnctor'a Profit........... 10.00% of dir. ! !1,908 <br />4. Job Superiateadaat (total !roe worksheet) l2,fi23 <br />Subtotal (A-: !5,013 <br />TOTAL CONSTBUCTIOH CONTRACT AMOUNT (direct plus 0 k P1: !24,091 <br />------------ <br />8, CNLBD CONTRACT ADMINISTRATION B%PBNSBS <br />Ite~ No.; Itea Description Cost (fl <br />.~. <br />1. Contract Preparation Fees.,... 4,25% of cntr.; !1,024 <br />2, Project Ngat. Btpenses (total Eros xorksheetl! f1, 600 <br />• Subtotal (Bi: ___ !2,624' <br />TOTAL INDIBBCT flBCGANATION COSTS (subtotals A tkrough BI: fT,63T <br />TOTAL PBBFOBNANCfl BOND AMOUNT (direct plus indirect costa-: !26,715' <br />