Laserfiche WebLink
BBCLANATION COST SUNNABY cont'd sheet 3 of 4 <br />N. BABTNVO6H - 9TBBAN CNANNBL BBCONSTBUCTION <br />Task No.; task Description Cost (SI <br />• N/A • ; No atreea channel reconstruction xork required - ; ' 30 <br />Subtotal (H): 30 <br /> <br />------------ <br />I. BA&TNNOBB - SBDINBNT POND/DIPBBSIOH DITCB/CNBCB DAN flBtlOVAL <br />Taek No.; Task Description Coat (31 <br />I 1 <br />N/A No pond rec1, xork included in this estiaate f0 <br />NJA . No ditch rect. xoek included in this estiaate f0 <br />1 <br />I 1 <br />1 1 <br />1 I <br />1 1 <br />1 1 <br />1 <br />1 1 <br />1 1 <br />1 I <br />1 1 <br />I 1 <br />1 <br />1 I <br />I I <br />1 1 <br />I 1 <br />1 I <br />1 <br />I I <br />l 1 <br />1 1 <br />1 1 <br />I I <br />f 1 <br />1 <br />I 1 <br />I 1 <br />1 1 <br />1 1 <br />I I <br />Subtotal (I): 30 <br />------------ <br />J. BASTHNOBB -TOPSOIL/SUBSOIL BBPLACBNBNT <br />Task No„ Task Descriptioa Cost (fl <br />1 I <br />1 ;Push topsoil stockpile oPf area to be regraded ~ 32,130 <br />3 ;Spread stockpiled topsoil over regraded area 32,Ofi0 <br />I <br />I I <br />I I <br />, I <br />1 1 <br />1 1 <br />, <br />I 1 <br />, , <br />I , <br />I I <br />1 I <br />I <br />, <br />1 <br />• <br />1 <br />I <br />I <br />I <br />1 <br />1 <br />1 <br />Subtotal (J(: 34,189 <br />