Laserfiche WebLink
COLORADO NINBD LAND 3°nCLAMATICN DIVISION <br />BSTINATING FOBN - BAUIPHBNT N05ILIZATION / DBHOBILIZATION <br />Task No, 3 Prep, by:cxb Tast Filename ;mobilization <br />Date: 01-Jul-91 Permit 4:c-81-039 Hine: grassy gap <br />Permit Action: settlement re-negotiation <br />Task Description: Load, haul, A unload equipment to A from job site <br />BOUBLP BAUIPHBNT COST <br />--------------------- <br />--------------------- <br />Transport Big - Tractor : <br />6x4, TS,000lb CYN, 3T5 <br />HP Diesel <br />- Trailer : 50 ton A 120 Ton fixed goosenect , drop deck <br /> Light Big Heavy Big <br /> (to 50 tons( (5 1 tone A over) <br />Coet Breskdoxm - Operator Cost/hr = 432,61 138.42 <br />"""""""' Operating Cost/hr = !23.65 127,26 <br />Driver CastlAr = !19.23 !19.23 <br />Belper Coat/hr = 517.43 117.43 <br /> Total = 292.9E 5102.34 <br />Project Bquipment Fleet: """"' """"' <br />Nachine Weight Oxnership Aaul Big Fleet Size Nob/Demob <br />Description (tons( Caet(hr Cost/hc (no. Aauled( Cost (hr <br />CAT D9 dozer 53.54 152.99 5 102.34 2 (310.66 <br />cat 627B scraper 38,00 646.37 692.92 2 !298,58 <br /> ;0,00 10,00 <br /> t0.00 10.00 <br /> so.oo sD.oo <br /> so,ao so,oo <br /> 1D.DO so.oD <br /> sa,DO 40,00 <br /> 50.00 so.oD <br /> f0.00 !0.00 <br /> 10.00 10.00 <br />------------------------------ --------- ------------- <br />Total Project ----------- <br />Nob/Demob -------------- <br />Cost/hr : ---------- <br />(589.24 <br />BAUIPHBNT GAUL DIBTANCB A TINB <br />------------------------------ <br />------------------------------ =---- ---------- <br />Major ci±y/torn xithin pr oject are a region: Aayden <br />Total distance = 12.0 miles. Avg. travel speed = 20.00 mpA. <br />Total lob Time = <br />JOB COST <br />0.50 Are load <br />0.60 hrs haul <br />0.50 hrs unload <br />0,60 Ars teturm <br />Z,20 Ars(trip s 2 trips: <br />4.40 Bours Total Mat/DemoA Time <br />TOTAL NOB/DBNOB C09T = !2,592.66 <br />1, . <br />• <br /> <br />C, <br />J <br />