Laserfiche WebLink
• Colorado Mined Gand BecIamation Division <br /> BSTIMATING FORM - <br />................. BULLDOZBB N08B <br />............... <br />• Task t: O1 Prep. by: CN8 Task File Nane: C039-O1 <br /> Date: 01/01/91 Perait i:C-B1-039 Nine: Craag Cap <br /> Perait Action: pond 4 slope redu ction <br /> Task Description: Be-grade Pond 4 <br /> AOU@LY BAUIPMBNT COST <br /> """"""""""` Basic Machine: Cat D9N 8orsepower: 170 <br /> Slade Type: Universal """ "" <br /> Attachment 41: SOPS Cab Shift Basis: 1/day <br /> Attachment 42: 3-shank ripper """"" <br /> Coat Sreakdoxn: <br /> """"""" Utilization S (code Aka) <br /> Ownership cost/ht - SS2.99 N/A <br /> Operating A overhaul costlhr- doter = !51.51 100 <br /> -ripper c fI,69 30 <br /> Operator cost/hr = f20.38 N/A <br /> Total egpt. unit cost/ht : 5126,51 Tota! fleet costlhr: 5253,14 <br /> MATBBIAL QUANTITIBB <br /> Initial Sxell ~- - _ Loose <br /> Yclume: 65,000.0 CCY Factor: 1,180 , Volume: 76,700.0 LCi <br /> Source of quantity take-off: ismlgem <br /> <br /> Source of est. swell factor: seneca <br /> flOUflLY PflODUCTION <br /> """"""""' Job Condition Correction Factors <br /> Avg. push distaste: 200 ft, """""""""""""""" <br /> """"' Operator....,.,... O,TS (avg.) <br /> Unadjusted hourly Nat, consistency.. 0.90 (Cat thl) <br /> dozer production: 701 LCY/ht Dozing method,..., : f.00 (gen.! <br /> """"' Visibility..,..,,.: I.00 (avg,) <br /> Material consistency: Job efficiency.,,. 0,83 (lsh/day! <br /> Compacted fill or embankment Transmission type.: 1.00 ( PS I <br /> """"""""'""""""""""" Crade adjustment., 1.39 (user) <br /> Avg. push gradient: 20.00 X (aeg) Altitude ad j, .,,.. 1.00 (Cat tbl) <br /> '""""' Material weight,..: 0.19 (Cat thl) <br /> Avg, Bite altitude: 7200 ft, Blade type...,....: 1,00 (S of U) <br /> <br /> Material weight 2900.00 lb/LCY Net Job Correction : 0.62 <br /> Mat, Descr.: ......... .. ........... <br /> Decomposed rock - 50% @ock, 50X Barth Adjusted Unit Prod.: 433,07 LCYIhr <br /> Adjusted Fleet Production: 866.14 LCYlbr <br />• JOB C09T " """""' <br /> Fleet size : 2 Dozers) Total Job Time: 88.55 Sours <br /> Unit Cost (0.292 ILCY Total Job Cost: 522,416.20 <br />