Laserfiche WebLink
Y~ ~ ` • <br />Mr. Larry Chartier Page 2 <br />October 13, 1983 <br />2. The new gravel pit and reclaimed pond must not have an exposed water <br />surface area that exceeds 8.5 acres. <br />3. You must agree that if water is required for either washing or dust <br />control, the county will not be allowed to use any water from the <br />exposed ground water pond. If water is required for these purposes, <br />the county shall obtain its water from a source which would allow the <br />use of the water in a mining operation. <br />I would appreciate a letter from you stating that you agree to meet the <br />above referenced conditions. I am also returning your photos and other infor- <br />mation that you provided with this letter. <br />°=--~-rely <br />A. Danielson <br />Engineer <br />JAD/RLS:ma <br />Enclosures <br />cc: Jim Clark, Div. Eng. <br />