My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE111910
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE111910
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:08:22 PM
Creation date
11/24/2007 9:00:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
7/18/2003
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate TR25
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 194 <br />Date : 04/11/2003 <br />User: JRS <br />Agency or organization name :Colorado Division Oi Minerals And Geology <br />Permit or other job action :Technical Revision 25 <br />Task description :Replace Topsoil from Stockpile to Drill Pads <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />Basic machine : Cat DBR Series 11 - SSU <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br /> Utilization <br />OwnershipcosVhour : $50.51 NA <br />Operating cosVhour : $61.43 100 <br />Ripper op.cosVhour : $0.00 G <br />Operator cost/hour : $24.01 NA <br />Total unit cosVhour : $135.95 Total fleet cosUhour <br />$135.95 <br />Initial Swell Loose <br />volume : 2,000 CCy factor : 1.125 volume : 2,250 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 75 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 1,017.1 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Consolidated stockpile Spoil pile : 0.80 _ (ind-rf) <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,200 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 tbs/LCY Ne[ correction : 0.41 <br />Weight description <br />Earth -Dry packed Adjusted unit production : 412.65 LCY/hr <br /> Adjusted fleet production : 412.65 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 5.45 Hours <br />Unit cost : $0.329 /LCY Total job cost : $741 <br />PermiVjob# : C-96-083 <br />Abbreviation :none <br />Filename : C083-194 <br />Horsepower: 310 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />