My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE111910
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE111910
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:08:22 PM
Creation date
11/24/2007 9:00:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
7/18/2003
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate TR25
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 193 <br />Date : 04/11/2003 <br />User : JRS <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br /> <br />Agency or organization name :Colorado Division 0/ Minerals And Geology <br />Permit or other job action :Technical Revision 25 <br />Task description : Regrade Light-Use Roads <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 1,450 <br />Basic machine :Cat D8R Series 11 - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : BOPS Cab <br />Attachment no. 2 : 3-shank ripper <br /> Utilization <br />Ownership cost/hour : $50.51 NA <br />Operating cosUhour : $61.43 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cost hour : $24.01 NA <br />Total unit cosUhour : $135.95 Total fleet cosUhour <br />Swell Loose <br />CCY factor : 1.165 volume <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Operator skill <br />Average push distance : 200 feet Material consistency <br />Unadjusted hourly production : 491.9 LCY/hr Dozing mothod <br /> Visibility <br />Material consistency description : Job efficiency <br />Compacted fill or embankment Spoil pile <br /> Push gradient <br />Average push gradient : 5.00 % (pos) Altitude <br />Average site altitude : 7,200 feet Material weight <br /> Blade type <br />Material weight : 2,900 Ibs/LCY Net correction <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production <br /> Adjusted tleet production <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time <br />Unit cost : $0.861 /LCY Total job cost <br />PermiUjob# : C-96-083 <br />Abbreviation :none <br />Filename : C083-193 <br />Horsepower: 310 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />X135-95 <br />1,689 LCY <br />Source <br />0.75 <br />0.90 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />0.90 <br />1.00 <br />0.79 <br />1.00 <br />0.32 <br />15793 LCY/hr <br />157.93 Lcv/nr <br />10.70 Hours <br />$1,454 <br />
The URL can be used to link to this page
Your browser does not support the video tag.