Laserfiche WebLink
i~ <br />e;:empt from liability should also be delineated. <br />AS PREVIOUSLY STATED, P&M IS NOT PREPARED „T THIS TIME TC <br />REQUEST BOND RELEASE FOR ANY PHASE OF RECLAMATION. <br />Y.OWEVER, IT DOES SEEM INAPPROPRIATE TO REQUIRE P&M TO BE <br />DOUBLE BONDED ON 'SOME PORTIONS OF WEST RIDGE AND MOFFAT. <br />THE DOUBLE BONDING RESULTS FROM THE EDNA MINE NOT <br />DISTURBING THE TOTAL AMOUNT OF ACREAGE DESIGNATED D!~RING <br />THE FIRST TERM WHILE BEING REQUIRED TO BOND FOR IT, AND <br />AGAIN BONDING FOR THE SAME AREAS DURING THE SECOND PERMIT <br />TERM. <br />• <br /> <br />