My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE111606
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE111606
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:08:07 PM
Creation date
11/24/2007 8:46:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004048
IBM Index Class Name
Permit File
Doc Date
9/7/2004
Doc Name
Appl Approval
From
DMG
To
Daub & Associates Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estlmating Software <br />BULLDOZER WORK <br />Task # : 001 <br />Date : 09/07/2004 <br />User : WHE <br />State :Colorado PermiUjob# : M-2004-048 <br />County :San Miguet Abbreviation :none <br />Site :Cedar Point Picture Rock Qua Filename : M048-001 <br />Agency or organization name : DMG <br />Permit or other job action : 110c permit application <br />Task description :Rip & grade 1.5 acres, replace OVB 3' depth <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />Basic machine :Cat D8R Series 11 - SSU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 1-shank ripper <br />Ownership cosUhour <br />Operating cost/hour <br />Ripper op. cosUhour <br />Operator cosUhour <br />Total unit cosUhour <br />volume : 7,260 LCY <br />Horsepower: 310 <br />Utilization <br />Shift basis : 1 per day <br />Data source : (CRG) <br />$50.90 NA <br />$66.44 100 <br />$2.29 25 <br />$31.83 NA <br />$151.46 Total fleet cost/hour <br />Swell Loose <br />factor: NA volume: 7,260 LCY <br />Source of estimated volume : (1.5ac)(43560sf/ac)(3'D)/27 = 7260 cy <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 75 feet <br />Unadjusted hourly production : 1,017.1 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 0.00 % (I <br />Average site altitude : 7,045 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Sandstone <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.369 /LCY <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.40 <br />Adjusted unit production <br />Adjusted fleet production <br />$151.46 <br />Source <br />411.02 LCY/hr <br />411.02 LCY/hr <br />Total job time : 17.66 <br />Total job cost : $2,675 <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.