Laserfiche WebLink
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 07-Sep-2004 <br />User : WHE <br />Permit or job no. <br />Abbreviation <br />Filename <br />Agency or organization name : DMG <br />Permit orjob action : 1 fOc <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> <br />001 -Rip & grade 1.5 acres, replace OVB 3' depth ~ dozer 1 176 $2,675 <br /> <br />002 -Topsoil replacement 3" depth over 1.5 acres dozer 1 1.5 $235 <br /> <br />003 -Revegetate 1.5 acres affected land ravage 1 3.0 $1,684 <br /> <br />004 -Haul reclamation equipment to and from job site ravage 2 4.7 $1,175 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 26.9 $5,769 <br />' inGudes inflation factor atljustment of : NA <br />TOTAL DIRECT COST' ~ $5,769 <br />OVERHEAD AND PROFR - Llabillty InaUranCe : 1.55 % Of direct total = $69 <br />Performance bond : 1.05 % of direct total = $61 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % o/direct total = $577 <br />'not required (or eqp. operator serves as super) TOTAL O & P = $727 <br />LEGAL • ENGINEERING -PROJECT MANAGEMENT - CONTRACT AMOUNT (tlirect+O & P) _ $6,496 <br />Financial warranty processing (IegaUrelated costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $325 <br />CONTINGENCY - NA' NA total = NA <br />'contingencies accounted /oral task level TOTAL INDIRECT COST = $1,552 <br /> TOTAL BOND AMOUNT (di rect + indirect) _ $7,321 <br />M-2004-048 <br />none <br />M048-000 <br />Site :Cedar Point Picture Rock Quarry <br />State :Colorado <br />County :San Miguel <br />