Laserfiche WebLink
<br />F.XHTR_TT - A (C'ONTT TRD) <br />(Revised 01/06/95) <br />This portion of the property is designated as ~rreas 2A (South <br />Platte River and Berm Area) and 2B and are shown on the <br />MINING PLAN MAP (EXHIBIT C-2), and as the "Water Reservoir and <br />River Channel" area on the RECLAMATION PLAN MAP, EXHIBIT F. <br />The structures within 200' of this portion of the proposed <br />mining area that are not under the ownership or control of the <br />applicant are: (1) the Wyco Pipeline; (2) greenhouse <br />structures within 50'± adjacent to the southeast corner of <br />this proposed mining area; and (3) the Bull Seep Ditch. Mining <br />in this area will be subject to agreement with the Urban <br />Drainage and Flood Control District on setback from the South <br />Platte River and improvements along the River, and the <br />previously mentioned agreement with the Wyco pipeline owner. <br />On the Bull Seep Ditch and greenhouse structures, the required <br />setbacks and the final sloping insure the stability of these <br />structures. The same previously mentioned two opinions by a <br />registered engineer copied in Appendix I also covers these <br />structures. <br />The third portion of the permit area is the 34± acre area east <br />of the Bull Seep Ditch to Monaco Street. This area is <br />utilized for irrigated and non-irrigated cropland, <br />pastureland, and other non-farmed or pastured area. Soils are <br />CN~'~~ fO , <br />ArtfA <br />~E3/f NATI ~I <br />Loamy Alluvial Land, moderately wet (Lw), Terrace Escarpments <br />(Tc), and Vona Sand Loam (VOB, 1-3°s slopes and VoC, 3-5°s <br />slopes). <br />This area is designated as Ar a on the MINING PLAN MAP, CN~"~('E~ <br />EXHIBIT C-2 and on the RECLAMATION PLAN MAP, EXHIBIT F. A(lE A <br />pflf~//~T <br />The structures within 200' of this portion of the proposed <br />mining area that are not under the ownership or control of the <br />applicant are: (1) the Bull Seep Ditch; and (2) Monaco Street <br />with approximately 24' of paved road, underground utilities, <br />and several power poles within the Monaco Street right-of-way. <br />As with the previous two portions of the permit area, the <br />required setbacks and the final sloping insure the stability <br />of these structures. The same previously mentioned two <br />opinions by a registered engineer copied in Appendix I also <br />covers these structures. <br />A more detailed breakdown of present use, soils, topography, and <br />vegetation is shown on PRE-MINING MAP, EXHIBIT C-1B, and EXHIBIT <br />I/J - SOILS AND VEGETATION INFORMATION. <br />