Laserfiche WebLink
6.4.5 Exhibit E -Reclamation Plan <br />Reclamation Activity AREA APPROXIMATE Reclamation Sequence <br /> (acres) VOLUME <br /> AvailableNOLUME <br /> Required (yd') <br />Backfill Phase II -Cell 3 As mined, during each <br />to historic grade with 11.4 75 <br />200/396 <br />000 non-flood season and <br />overburden from Phase I , <br />, when mining of cell <br />- Cell 3 completed <br />Backfill Phase II -Cell 3 As mined, during each <br />to historic grade with 277,900/396,000 non-flood season and <br />overburden from Phase II when mining of cell <br />-Cells 1, 2 & 3 completed <br />Backfill Phase II -Cell 3 As mined, during each <br />to historic grade with 42 <br />900/396 <br />000 non-flood season and <br />overburden from pit floor , <br />, when mining of cell <br />of Phase II -Cells 1 & Z completed <br />Grade slopes on East, As each area of the cell is <br />South, and Southwest of 21 3 mined <br />Phase I I -combined 21,400/21,400 <br />Cells 1 & 2 from 2:1 to <br />3:1 using balanced cut/fill <br />Grade slope on West of Upon completion of mining <br />Phase II -combined of west area of the cell <br />Cells 1 & 2 from 2:1 to 6,100/6,100 <br />3:1 using material pushed <br />from pit floor of Cell 2 <br />Grade slope on North of Upon completion of mining <br />Phase II -combined of north area of the cells <br />Cells 1 & 2 from vertical 39 <br />000/39 <br />000 and Cell 3 backfilled at <br />to 3:1 using material , <br />, least along this side <br />pushed from pit floor of <br />combined Cells 1 & 2 <br />Topsoil replacement on Following slope Backfill <br />Phase II 16.7 13,440 <br />Seeding and fertilizing of 16 ~ Following Topsoil <br />Phase II Replacement <br />November 16, 2006 Bokelman/Walters Pit <br />Page 9 of 36 Regular 112 Permit Application <br />