Laserfiche WebLink
• ~ <br />9. Has the applicant identified the other permits, licenses and <br />approvals which he presently possesses or will be seeking and <br />which are necessary to conduct the proposed mining operation <br />(Rule 6.4.13)' <br />(Anderson, 9/21/98), (8) <br />10. Has the applicant provided complete and accurate <br />demonstration of his source of legal right to enter (Rule <br />6.4.14)7 <br />(Anderson, 9/21/98), (7) & (15) <br />11. Is the proposed reclamation bond adequate to insure <br />reclamation (Rule 4.2.5}? <br />(Bradley, 10/23/98), (19) <br />ISSUES NOT TO Bfi CONSIDERED <br />The Pre-Heazinq Conference Officer has determined that the <br />following issues are not within the jurisdiction of the Board as <br />specified by the Construction Materials Act and the Construction <br />Materials Aules and Regulations. Therefore, the following issues <br />will not be considered: <br />1. Consistency with Routt Special Use Permit: (This is the <br />responsibility of the Aoutt County Planning Department) <br />(Anderson, 9/21/98), (1)-(7) inclusive, (10) <br />2. Visual impacts: (This is the responsibility of the Routt <br />County Planning Department). <br />(Anderson, 9/21/98), (8) & (9) <br />3. Possible change to Corps of Engineers 404 Permit: (This is <br />the responsibility of the U. S. Army Corps of Engineers). <br />(Anderson, 9/21/98), (11) <br />4. Noise: (This is the responsibility of the Routt County <br />Planning Department and the Colorado Department of Health) <br />(Anderson, 9/21/98), (5) <br />(Bradley, 9/22/98), (12) <br />4 <br />