My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE111187
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE111187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:46 PM
Creation date
11/24/2007 8:20:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989029
IBM Index Class Name
Permit File
Doc Date
6/26/2000
Doc Name
APPLICATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAhIAS Colorado, Inc. <br />Longmont Distel Oparatians <br />Page 2 <br />f) There will be no chazrge in the equipment fleet from thr, existing USR 877 Permit. Loaders <br />and scrapers will be used in the mitring operations, On-rc~~td haul tnrck will be used to <br />n~rtsport material off of the existing plant property. <br />g) Fire protection is provided by Mountain Vicw Fire Protection District, totaled at 911') <br />County Line Rc•ad, Longmont, CO. <br />h] A wa?er supply plan is in place for the existing petYrtitb;d operations. The source of <br />replacement water is Consumptive Use credit from the Coffin-Davis Ditch during the <br />irrigation season and a lease tiom the City if Longmont fer the non-irrigation season. The <br />water supply plan will be updated to reflect the change in production for the expansion <br />operations. <br />i)'fhe sewage disposal system at the plant and office site is a septic vault. <br />j) No storage of iterss or wazehouse facilities aze propose! for the property <br />G. Ttte mine plan is provided in Exhibit D, Attachment 1. <br />A reclamation plan and reclamation map are provided in Exhibits E and F, respectively, <br />Attachment 1. Reclamation will be completed in 2 to S yeazs following the complerion of <br />mining operations <br />B. Storm water is collected in dewatering trenches in the mini oils and dischazged accordin;; to <br />existing Colorado/NPDES stormwater dischazge permits maintained by the applicant. <br />9. Mining of the Peschel property will begin at the completion of cut7ent mining opcmtions, in <br />early 2001, and is expected to take approximately three to four years. Mining oFthe <br />Longmont prooerty will begin at the completion of rho Peschel ptpcrty and is expected to <br />take approximately three to four yeazs. Mining of the Distcl expansion is expected to take <br />approximately 0.3 years. This area will be mined in conjunction with or at the completion of <br />the Longmont property. <br />to Extracted resources aze temporarily stored ir, stockpiles on the previously permitted plant <br />site. Topsoil and overburden all be temporality stored in stockpiles on the permitted <br />properties. Reclamation includes the construction of a pcnnanent overburden stockpiles .at <br />the south ends of the Peschel property. This stockpile is expected to be built to 3 feet abcve <br />the current topography. Tha location of stockpile is sho•Nn on Exhibit £1, Attachment 1. <br />\LSAKAICAAIMOMfiKnell\Projec0.5:IQAUSA Applicodon Accuirtruoe.ecc <br />
The URL can be used to link to this page
Your browser does not support the video tag.