My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE111155
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE111155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:45 PM
Creation date
11/24/2007 8:17:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
6/19/2006
Doc Name
Existing Facilities Area Conditions
Section_Exhibit Name
Tab 12 Attachment 12-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the ditches are identified as Ditch A on Exhibit 12-5 (Revision 0, dated <br />2/3/93). Because these ditches were only shown on the design and were not <br />constructed, the design is not included in Attachment 12-1A. <br />Access Roads: There is one access road, designed and constructed by the previous <br />owner/operator/permittee (H-G Coal Company), within the permit area. The road <br />alignment is shown on Exhibit 12-2 (Revision 5, dated 8/99). The facility area <br />access road starts from haul road HGLF-HR1 at the west gate of the facility area and <br />runs past the office/change building, looping north of the emergency coal stockpile <br />area and the Truck Dump Hopper. It then travels eastward between the water tank and <br />the crusher building along the northern margin of the reclaim coal stockpile area to <br />the train loadout building. <br />The access road is approximately 20 feet to 30 feet wide, drainage from the road is <br />controlled by existing Ditch 1, as well as existing Ditches 5 and 6. HGTI has been <br />unable to locate any design or construction documentation in the project files, <br />however, HGTI assumes the road was designed and constructed in accordance with CDMG's <br />regulations as described in Appendix 12-3. <br />HGTI conducted a survey of the access road during May 2006. Survey data were used to <br />develop a profile of the existing conditions. The profile is presented in Appendix <br />12-5 as Appendix 12-SC, Facilities Area Road Plan and Profile. This exhibit has been <br />prepared in accordance with Rule 4.03.2(1)(f)(ii), which allows a relevant showing in <br />lieu of certification of design and construction for roads constructed prior to <br />August 1994. As such, the certification on Exhibit 12-SC only pertains to the <br />existing conditions. HGTI assumes that because there has been no CDMG concern or <br />issue documented in any monthly compliance inspection report or other permit review <br />since 1992 that the access road is in compliance with the performance standards of <br />Rule 9.03.2. <br />Support Facilities <br />The configuration of the existing buildings (support facilities) is shown on <br />Exhibit 12-1 (Revision 9, dated 8/99) and Exhibit 12-2 (Revision 5, dated <br />5/99). Table 12 -1.2, Existing Loadout Buildings Summary, describes the <br />buildings that are existing and on the ground. <br />TR-07 9 Revised 06/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.