Laserfiche WebLink
2. Go to gage. <br />( 3. Fold back top and lift off. <br />,`, 4. Take milk bucket contents and throw on ground. <br />5. Add 1/2 gal. to bucket and place in machine. <br />~: Replace top and start gage. <br />Whenever one has freezing or evaporation problems, or when bucket is full <br />of N20 and needs to be dumped <br />Raingage at Train Loadout <br />This station is located within the Train Loadout Area and consists of a <br />simple, yet accurate, device. The device is a 25.5-inch high, 9-inch diameter <br />tin can. Water depths are measured daily at approximately 6 A.M., thereby sup- <br />plying a continuous daily precipitation recording instrument at the Train Loadout <br />Area. The information is given to a CWI Engineer for storage until needed. <br />~, <br />\• <br />