Laserfiche WebLink
III IIIIUIIIIIIIIII <br />.:ovenber 13; 197J <br />Suburban Sand 5 Gravel Company <br />5360 1,*adsworth 31vd. <br />Arvada, L'olorado 80002 <br />RL: Zoad Runner Rest II Pit <br />Our File No. 79-195 <br />Dear t•Sr. Craft: <br />In order to consider this application adequate for the .7anuary 23-24, 1980, <br />;nesting of the litaed Land Reclamation Board, we will need the followin8: <br />A. %xhibit D - 1•:ininE Plan and Timetable <br />1. Due to the delays encountered in this mine application, what is <br />the revised date that mining will commence? <br />2. Will this mine have any adverse effects on Che bulldinga located <br />within 200 feet of the boundary? <br />3. Exactly where will the setback areas for topsoil and excess over- <br />burden stockpiles be located? <br />4. Topsoil which will be stockpiled for more than 1 year should have <br />the cover crop planted. <br />H. Exhibit E -Reclamation <br />1. How many inches of topsoil will be replaced? <br />2. A soil sample should be taken after replacing the topsoil is Phase <br />I to determine what fertilizer is actually needed. Thereafter, soil <br />samplna should be taken as seeded. <br />