Laserfiche WebLink
Reclamaxion Plan <br />F.XHIBITD <br />Mining Plan , <br />As site gets cut down to useable grade, reclamation will begin. <br />All slopes will be cut at 3:1. <br />Any slope more than 3: I to be retained with boulders, Six foot terraces. <br />There will be four inches minimum for replacement topsoil on slopes. <br />All topsoil will come from onsite supplied and some already imported. <br />All trees possible to save will be saved. <br />Slopes will be re-seeded with native grass and wild flowers. <br />Onsite trees will be re-located to slopes. <br />Bottom flat area will be covered with road base not to exceed one inch minus. <br />During reclamation all erosion control will be regulated to its fullest by means of berms, silt <br />fencing, and straw bales etc. <br />4 <br />