Laserfiche WebLink
Mining Plan <br />EXHIBIT C <br />- _ _ -- - - <br />. _ _ _ _ _ Mining Plan _ _ _ <br />Boulders, Sand, Cobble will be extracted from site with use of heavy equipment <br />Boulders will be separated into various sizes and hauled out with trucks. <br />Cobble will be separated into size and hauled out with trucks. <br />Sand will be sluiced to recover the gold and then sold as masonry sand and mixed back in <br />for road base. <br />Rock that does not meet size is then crushed for gravel. <br />Cuts up to SO' to be made for clean up. <br />No chemicals, acids, mercury etc. will be used in operation, just heavy equipment, diesel and <br />gasoline for machines. <br />There will be two settling ponds for sluice operation. Water will be circulated and reused. <br />First pond will get cleaned continuous, second pond wilt get cleaned periodically. <br />All erosion control gravel filters, silt fencing, betming, straw will be monitored at all <br />times. <br />Our reclamation plan is our mining plan, our overall outcome is to make the land useable. <br />7 <br />