Laserfiche WebLink
~~~E~nergy° <br />2538 Blichmann Avenue <br />Grand Junction, Coloradc 87505 <br />January 22, 2003 <br />Mr. Pete Sigmond <br />United Companies <br />P.O. Box 3609 <br />Grand Jct., CO 81502 <br />Dear Pete, <br />Tn response to your request for Xcel Energy approval to install two culverts under our <br />high-pressure natural gas pipeline at your gravel pit, Xcel does not have a problem w•itti <br />the installation. <br />Our crossing policy requires that the culverts be installed at least 2 feet under the <br />pipeline. It is required that you notify the ONE Call Center 48 hours before doing the <br />work so that Xcel can have a person on site while the digging is being done. If you chose <br />to bore under our pipeline instead of digging it is required that the pipeline be potholed to <br />verify depth before the boring can be completed. <br />If you have any questions or need further clarification please call me at 970-244-2788. <br />Larry Gierhart <br />Manager Gas operations <br />