My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110599
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:21 PM
Creation date
11/24/2007 7:52:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
5/12/2003
Doc Name
pages 2.05-1 through 2.05-58i
Section_Exhibit Name
Rule 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.3 <br />The Bowie No. 2 Mine will utilize the Bowie No. 1 Mine unit train loadout. <br />The unit train loadout will remain the responsibility of the Bowie No. 1 Mine, <br />and will remain subject to the requirements of DMG permit C-81-038 unless <br />the loadout is transferred to the Bowie No. 2 Mine permit. <br />(3)(a) Following is a discussion of the proposed mine facilities: <br />Portal Conveyor Transfer Buildings <br />• <br />PR-07 <br />A PPRovED <br />S~1 ~-~03 <br />The D-Seam portal conveyor transfer building is a structural steel building <br />where the main belt from the mine terminates. The coal from the mine will <br />transfer to the stockpile conveyor. Gob conveyed from the mine will be <br />transferred to the gob belt. The dimensions ofthe building are approximate <br />20 feet by 24 feet by 45 feet high. The B-Seam will have a similar transfer <br />building. Gob conveyed from the B-Seam will be transferred to a gob belt., <br />Coal conveyed from the B-Seam will be stockpiled by a radial stacker. <br />Stacking Tube <br />The raw coal is stacked by this concrete tube to minimize coal segregation <br />and air particulate emissions. The tube is approximately 85-feet high and <br />12-feet in diameter. It has 4 foot openings to allow coal to flow from the tube <br />to the stockpile area. The stacking tube is located directly on the reclaim <br />tunnel. <br />Reclaim Tunnel <br />The reclaim tunnel is located under the stacking tube and a 70,000 ton <br />stockpile. It is of reinforced concrete construction. The typical inside <br />dimensions of the tunnel are 13 feet high by 12 feet wide. The tunnel is <br />approximately 245 feet long. A 36-inch diameter escape tube is located on <br />the east end of the tunnel. The 120 foot long escape tube terminates at a <br />concrete fan housing that is approximately 6 feet by 6 feet by 8 feet high. <br />Screen and Crusher Buildino <br />The screen and crusher building is a structural steel building that is <br />approximately 52 feet high. The building houses a double deck screen and <br />crusher. It has the capability of producing 2"x0" crushed coal and stoker <br />2.05 - 9 - 2/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.