My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110599
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:21 PM
Creation date
11/24/2007 7:52:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
5/12/2003
Doc Name
pages 2.05-1 through 2.05-58i
Section_Exhibit Name
Rule 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.3 <br />4. Benches <br />The proposed surface disturbance for the upper mine facilities includes the <br />construction of benches with related access roads. The first or upper is a <br />utility bench for a water tank, electrical substation and ventilation shaft and <br />two fans. The second bench or D-Seam portal bench is developed for an <br />office, change house, shop, warehouse, screen and crusher building, coal <br />stockpile, reclaim tunnel, radial stackers and other facilities. Portions of the <br />portal bench will be utilized for material storage and other mine facilities that <br />are discussed in section 2.05.3(3). A small bench along the haul road was <br />constructed for the downhill conveyor transfer and drive building. The B-~"" <br />Seam portal bench will be developed for a coal stockpile, radial stacker and <br />otherfacilities. Another bench was constructed along old State Highway 133 <br />for the coal stockpile, reclaim system and truck loadout. <br />5. Gob Pile <br />' A gob pile was constructed east of the mine entrance below the old King <br />Mine portals beginning at the level of the old railroad track grade. The <br />• disturbance associated with the gob pile includes clearing the area <br />necessary to form the boundary of the pile. Facilities associated with the gob <br />pile include a topsoil stockpile, cover fill stockpile, haul road and a sediment <br />pond. <br />6. Unit Train Loadout <br />The disturbance associated with the unit train loadout is located south of the <br />mine along the Union Pacific mainline. A conveyor, new track and a batch <br />weigh system will be installed. Approximately 2,800 feet of mainline must be <br />relocated so the lead and parallel storage track can be constructed. The <br />lead track is 8,240 feet long and. the storage track is 3,570 feet long. <br />(3) Mine Facilities <br />The major surface facilities are located north of the North Fork of the <br />Gunnison River. The D-Seam mine portals are located about 800 feet <br />above old State Highway 133 at an elevation of approximately 6880 feet <br />where the D-2 Seam outcrops. The B-Seam mine portals will be located <br />about 550 feet above old State Highway 133 at an elevation of approximately <br />6630 feet. The loadout is located along the mainline of the Union Pacific <br />Railroad at an elevation of approximately 5880 feet. The surface facilities <br />. consist of sediment control structures, coal handling facilities, unit train <br />loadout, support facilities for mine operations and other related facilities. <br />P R-07 <br />2.05 - 8 - 2/03 <br />APPRov61~ <br />$ /(z~ 03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.