My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110599
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:21 PM
Creation date
11/24/2007 7:52:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
5/12/2003
Doc Name
pages 2.05-1 through 2.05-58i
Section_Exhibit Name
Rule 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.3 <br />similarly maintained. The road surface will be periodically watered and <br />maintained with a motor grader. Gravel will be added to the road surtace as <br />necessary. <br />The haul roads in the permit area can be broken into four segments for <br />discussion as follows: <br />1) Haul Road -State Highway 133 to Portal Level <br />General <br />This haul road handles the small amount of the coal hauled from the site and <br />is approximately 9500-feet long. Coal haul trucks enter the property and <br />proceed to the portal level. The trucks are loaded by a front end loader and <br />return to old State Highway 133. The drainage from the majority of this road <br />is routed to sediment Pond B and C. Alternative sediment control is utilized <br />for the first 100 to 150 feet of the haul road. The upper 2.500 feet of this <br />road will be utilized to haul coal from the B-Seam bench up to the D-Seam <br />• bench. <br />The combination of paving, dust control, sediment control on the majority of <br />the road and utilization of alternative sediment control on the remainder of <br />the road will assure that erosion, siltation, pollution of air or water, and <br />damage to public property will be controlled. These controls will also assure <br />that no damage to fish and wildlife or other related environmental values will <br />occur. <br />This road is the main access to the mine facilities so employees, contractors, <br />vendors, supply vehicles and visitors will utilize this road. This road will also <br />be utilized to haul gob from the portal bench to the gob pile. The truck traffic <br />which will utilize this haul road segment will be 10 and 18 wheel trucks. This <br />road has two 12-foot lanes with curve widening on curves with a radius of <br />less than 180-feet. A 24-foot wide paved road surface with curve widening <br />should be adequate for the intended traffic. <br />• <br />PR-07 <br />2.05 - 19 - 2/03 <br />APPRovE~ <br />s~~~o3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.