My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110599
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:21 PM
Creation date
11/24/2007 7:52:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
5/12/2003
Doc Name
pages 2.05-1 through 2.05-58i
Section_Exhibit Name
Rule 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.3 <br />tunnel, the conveyor is truss mounted and partially enclosed foranother340- <br />feet where it enters the transfer building. <br />13. loadout Conveyor <br />The loadout conveyor transports coal form the transfer building to the batch <br />weigh loadout. This 1,000 foot long 60-inch wide belt is truss mounted and <br />totally enclosed. <br />14. Radial Stacker #2 <br />This radial stacker conveys raw B-Seam coal from transfer building to the <br />raw coal pile. This 48-inch radial stacker is approximately 150-feet long. Its <br />wheels are supported by a concrete runway. <br />(c) Haul Roads <br />A road is a surface right-of-way for purposes of travel by land vehicles in coal <br />. exploration or surface coal mining and reclamation operations. A haul road <br />is any road used for the transportation of coal, spoil or coal mine waste. <br />A typical haul road section is presented on drawing HR-1, Haul Road <br />Section, presented in Volume V. Typically haul roads will be 20 to 24 feet <br />wide with an earth and rock safety berm or guardrail on the outside slope <br />and a drainage ditch on the inside. The haul roads will be plated with 10 to <br />20-inches of gravel surfacing. The main haul road from old State Highway <br />133 to the portal level is paved. Haul roads will be watered and cleaned as <br />necessary to control fugitive emissions. Chemical dust suppression may <br />also be used on heavily traveled roads to control attendant air pollution. <br />The main haul road from old State Highway 133 to the portal level will be <br />maintained in accordance with Rule 4.03.1(6). The paved road surface will <br />be patched as necessary and potholes will be filled. Ditches along the <br />roadway will be periodically cleaned with a motor grader and the road <br />shoulders will be smoothed to conform to the paved surface. Cut and fill <br />sections will be vegetated and gullies, if any, will be repaired at least <br />annually. If the haul road is damaged by a catastrophic event such as a <br />flood or earthquake, it will be repaired as soon as practicable after the <br />• damage has occurred. The gravel surfaced haul road to the gob pile will be <br />PR-07 <br />2.05 - 18 - 2/03 <br />/~~PRovED <br />S~i2Jo3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.