My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110599
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:21 PM
Creation date
11/24/2007 7:52:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
5/12/2003
Doc Name
pages 2.05-1 through 2.05-58i
Section_Exhibit Name
Rule 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.3 <br />Power Line <br />A high voltage overhead powerline extends from the existing Delta Montrose <br />Electric Power line to the portal area substation. The power line is <br />approximately 5,600 feet long. Approximately 750 feet of new power line will <br />be constructed for the downhill conveyor. About 500 feet will be constructed <br />at the portal bench and 250 feet at the highway stockpile area. The B-Seam <br />portal bench will require another 200 feet of powerline. <br />Non-Coal Waste Storaae <br />Non-coal waste will be stored at the portal levels. Three concrete walls will <br />be constructed to form the storage area. The walls will form a u-shape. The <br />storage area will be approximately 20-feet wide, 30-feet deep and the walls <br />will be 6-feet high. Commercially available dumpsters may be used in lieu <br />of the concrete structures. Non-coal waste will also be stored in dumpsters <br />• located in areas defined in 2.05.3(8). <br />Temporary Gob Piles <br />Gob will be periodically transported from the underground workings with the <br />mine conveyor. At the portal transfer tower, gob is transferred to the gob <br />conveyor. The gob is stacked in a temporary gob pile which is located near <br />the transfer tower on the D-Seam and B-Seam portal benches. The gob is <br />then rehandled by front-end loader and trucks and transported to the <br />permanent gob disposal area. Certain conditions such as inclement weather <br />or severe winter conditions may preclude access to the permanent gob pile <br />for extended periods of time. Therefore, gob may be stored in the temporary <br />gob piles for up to 30 days. Up to 1500 tons may be stored in the temporary <br />gob piles at one time. <br />Rock Dust Storage Areas <br />The D-Seam portal bench and the B-Seam portal bench will have a steel <br />rock dust silo approximately 50 feet high and 8 feet in diameter. A <br />cinderblock building under the silo, which houses a rock dust pod and a <br />distribution compressor is approximately 30'X 20' X 8'. <br />L~ <br />PR-07 <br />2.05 - t 3 - 2/03 <br />A PPRovED <br />S ~ 1203 <br />