My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110488
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110488
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:17 PM
Creation date
11/24/2007 7:48:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Tab 23 BONDING
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 23 <br />BONDING <br />Introduction <br />The purpose of this chapter is to provide a reclamation cost estimate, with supporting <br />documentation, for determination of a reclamation performance bond for lands disturbed at <br />the Hayden Gulch Loadout facility. This document will provide information regarding all <br />disturbed lands within the proposed permit boundary. The amount of bond required was <br />developed assuming that the bond would be forfeited and the Colorado Division of Minerals <br />and Geology would assume the reclamation liability. Once the railcar unloading facilities <br />are constructed, the reclamation bond estimate, as presented here, wi 11 not change over <br />the life of the operation. <br />The calculations, costs, and backup documentation for all disturbed lands and facilities <br />are generally located in the following attachments: <br />Attachment 23-1 Hond Cost Woxkeheeta <br />Attachment 23-2 FPC Shesta <br /> <br />Reclamation Cost Categories <br />Experience in reclaiming lands has shown, for the purpose of estimating costs, contract <br />reclamation activities can be grouped into the following categories: <br />Direct Costs <br />1. Backfilling and grading <br />2. Topsoil replacement <br />3. Revegetation <br />4. Facility reclamation <br />Indirect Costs <br />1. Mobilization and demobilization <br />• 2. Engineering redesign fee <br />I Revised O6/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.