Laserfiche WebLink
~~ <br /> <br /> <br />Introduction <br />Reclamation Cost Catego ri e5 <br />Bac kfilling and Grading <br />Topsoil Replacement <br />Aevegetation <br />Facility Reclamation <br />Structure Demolition <br />Powe rl fines <br />Facility Areas <br />Miscellaneous Utilities <br />Sediment Ponds <br />Road Reclamation <br />Railroad <br />Coal Stockpile <br />Finish Grading <br />Ri11 and Gu11y Repair <br />Fleet Determination <br />Production Shifts <br />Equipment Types <br />Reclamation Time Frame <br />indirect Costs <br />Mobilization and Demobilization Costs <br />Engineering Redesign Fee <br />Contractor Profit and Overhead <br />Reclamation Management Fee <br />Public Liability Insurance <br />Con[ractora Performance Bond <br />Cost Summary <br />Bonding Summary <br />References <br />TAB 23 <br />TABLE OF CONTENTS <br />Page <br />1 <br />1 <br />2 <br />2 <br />3 <br />3 <br />3 <br />4 <br />9 <br />9 <br />4 <br />4 <br />4 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />6 <br />6 <br />6 <br />6 <br />6 <br />7 <br />7 <br />7 <br />8 <br />10 <br />11 <br />i Aevised OS/00 <br />