My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110390
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110390
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:14 PM
Creation date
11/24/2007 7:45:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976027
IBM Index Class Name
Permit File
Doc Date
11/12/1996
Doc Name
FINANCIAL WARRANTY RECALCULATION CRAIG PIT PN M-76-027
From
DMG
To
NIELSONS INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. r • <br />Subtotal (M): 514,390 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 524.508 <br />RECLAMATION COST SUMMARY cont'd <br />K, PORTAL/SHAFT SEALING <br />is sk No.l Task Description <br />--------I------`---------------------------- <br />NA I No portals or shaft sealing required <br />I <br />I <br />I <br />sheet 4 of 4 <br />I Cost (f) <br />I ---------- <br />I <br />I <br />I <br />I <br />Subtotal (K): <br />L, DRILL HOLE/MONITORING WELL SEALING <br />Task No. Task Description Cost (f) <br />------ I --------------------------------------------- I -------- <br />NA No drill holes or monitoring wells created. <br />I I <br />I I <br />I I <br />Subtotal (L): <br />M, MISCELLANEOUS RECLAMATION TASKS <br />Task No. <br />-------- I <br />----------- Task Description <br />------------------------------------- I Cost (f) <br />--------- <br />I <br />9 I I <br />Demolition assume 10'L *10'W *5'H mass @ 50.22/cfl <br />5110 <br />5 ~ 7 I Seeding Per attached tasks 5-7 worksheets. 57.480 <br />10 I Fencing Livestock fence 1650' @ 53.73/ft. 56.155 <br />8 Mob/Demob Per attached task 8 worksheet. 5645 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 6 PROFIT <br />Item No. <br />-------- l Item Description <br />--------------------------------- <br />--- <br />------------- Cost (f) <br />---------- <br />1. I <br />Public Liability Insurance.... 1. I <br />550% of dir. 5380 <br />2. Contractor's Performance Bond 0. 975% of dir. I 5239 <br />3. Contractor's Profit........... 10 .00% of dir. 52.451 <br />4. Jab Superintendent..Eq op serves as super. <br />Subtotal (A): 53.070 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 & P): 527.578 <br />B, DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.l <br />--------I--------- Item Description <br />-------------------------- I <br />---------------I- Cost <br />------ (f) <br />----- <br />I <br />1. Minerals <br />-- <br />----- <br />Program Adm <br />------ <br />--------- <br />--- I <br />5.00% of cntr.l <br />------- <br />------ <br />51 <br />------ <br />.379 <br />----- <br />-- <br />------- <br />- <br />NET INDIRECT COST -- <br />--- <br />- <br />PERCENTAGE: 16.15% -- <br />Subtotal (B ): 51 .379 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 54 .449 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 528 .957 <br />
The URL can be used to link to this page
Your browser does not support the video tag.