Laserfiche WebLink
y Y • <br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHWORK -STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (f) <br />NA ~ Stream channel reconstruction not required at ~ <br />~ this time. I <br />~ ~ <br />~ ~ <br />Subtotal (H): <br />I. EARTHWORK -DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (f) <br />-------- I -----------~------------------------------- I ------------ <br />NA ~ No drainage control system to remove. ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />Subtotal (I): <br />J. EARTHWORK -TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (S) <br />3 <br />4 <br />Topsoil replacement for 2H:1V slopes. 1.3 ac. ands 51.322 <br />pit floor. 6 ac. Total area 7.3 ac at 0.6'D. ~ <br />Topsoil replacement for processing area <br />at 1' D. <br />I <br />4.65 ac.~ f1.974 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Subtotal (J): f3.296 <br />