My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110220
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110220
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:06 PM
Creation date
11/24/2007 7:37:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
Permit File
Doc Name
Rockcastle 5/6 11/26/91
Section_Exhibit Name
Reclamation Project Binder
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />• Actives/Submittal Com In etion <br />(following notice <br />to proceed) <br />Pits 1/2/3 <br />- Remove and reclaim Ponds 2 and 10 weeks <br />3 and associated ditches <br />- Modify or repair road drainage 10 weeks <br />structures <br />Pit 4 <br />- Bond release request (Backfilling 10/16/91 <br />and grading - $32,244, Reseeding - <br />$18,906) <br />- Remove, modify or repair ditches 2 weeks <br />and culverts <br />• - Regrading and pond modifications 5 weeks <br />- Bond release request (Regrading, 6 weeks <br />$15,603) <br />- Install toe drains and modify toe 3 weeks <br />~ buttress <br />- Bond release request (Stabilization 4 weeks <br />of slide areas, $15,000) <br />- Modify or repair road drainage 3 weeks <br />structures <br />Pits 5/6 (All noted work to be completed next spring) <br />- Remove and reclaim upland Spring <br />diversion ditches <br />- Remove, install, modify or repair Spring <br />ditches, culverts, and rock drainages <br />- Remediate and reseed problem Spring <br />areas <br />-17- <br />
The URL can be used to link to this page
Your browser does not support the video tag.