My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110064
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:06:59 PM
Creation date
11/24/2007 7:29:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 15 Subsidence Prediction
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 1.9 LONG TERM PILLAR STABILITY <br />The long term stability of the pillars in the bleeder entries in the Bowie No. 2 Mine was <br />evaluated using the Salamon and Munro pillar strength equation. To assure long term <br />stability a pillar must possess a factor of safety of 1.5 or better. The load a pillar is carrying <br />is estimated by calculating the full tributary area load, namely half-way to each adjacent <br />pillar and all the way to the surface. The tributary area loading assumption is correct for <br />pillar load estimation if the pillars are all the same size as they are in this area. The <br />maximum overburden depth in the bleeder entries adjacent to Hubbard Creek is 500 feet <br />and under Dove Gulch the maximum depth is 1100 feet. <br />The Salamon and Munro Pillar strength equation is applied as follows: <br />Pillar Strength (psi) = K x W o.<e~ ~HO.ssj <br />Where: <br />K = the uniaxial compressive strength of an equi-dimensional coal sample in <br />psi = 3,100 psi' <br />W =the least width of the pillar in inches <br />H =the height of the pillar in inches <br />• <br />Factor of Safe Caculation <br />Location Hubbard Creek Bleeders Dove Gulch Mains <br />Vertical Stress Calculation <br />Maximum Overburden 500 1100 <br />Overburden Weight #/CF 150 150 <br />Entry Centers 100 120 180 85 <br />Pillar Size 82 102 162 67 <br />Extraction Ratio 43% 41% <br />Stress in Pillar (psi) 747 1615 <br />Pillar Strength Calculation <br />W =Least width of Pillar (in) 984 804 <br />H =Height of Pillar (in) 114 114 <br />Pillar Strength (psi) 3240 2953 <br />Factor of Safet 4.3 1.8 <br />The areas in the Bowie No. 2 Mine, where limited extraction is proposed, will not <br />realize an extraction ratio as high as 50 percent. Development pillars will be left in the <br />areas. The development pillars result in a factor of safety greater than 1.5 which will <br />assure the long term stability of the areas. <br />• 1 Coal strength obtained from the report "Longwall Geotechnical Appraisal" prepared for <br />Bowie Resources Limited by Agapito Associates, Inc., dated September 1998 <br />-18- <br />02/01 <br />PQ- ri <br />z~~7~0 / <br />
The URL can be used to link to this page
Your browser does not support the video tag.