Laserfiche WebLink
Kvaerner Metals Project No. 306900 <br />- • Genera~ecincation No. GG18 <br />Geosynthetic Liner <br />The lining system will be accepted by the Engineer after all seams have been <br />verified, any testing requved by the Engineer is completed, and all documentation <br />for installation approved. <br />7.0 CLEAN-UP <br />Clean-up within the work area shall be an ongoing responsibility of the Contractor <br />throughout the course of the work. Particular care shall be taken to Insure that no trash, <br />tools, and other unwanted matenals are trapped beneath the liner. <br />Upon completion of the work, the Contractor shall remove, from the site of the work, all <br />tools, machinery, scraps of liner matenal, rubbish and all other waste matenals for which, <br />in the opinion of the Engineer, he or his subcontractors are responsible and shall leave <br />the work free and clear from all obstructions and hindrances. <br />I t70U1NR1~lC1SiRlICT1GCI~YC DOC_ An IAI 10 ^•~~M ti4~ It. 1~ <br />