My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110035
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:06:58 PM
Creation date
11/24/2007 7:27:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992038
IBM Index Class Name
Permit File
Doc Name
COVER SHEET SAND CREEK MINE REVISED MLRB 112 PERMIT APPLICATION ADAMS CNTY COLO 05/1992
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[7 <br />-4- <br />Notice Requirements <br />~ ~ Immediately after the first publication of your notice in a newspaper of general <br />circulation in the locality of your proposed mining operation, you must mail a copy of <br />the notice to all owners of record of surface rights to the affected land and all owners <br />of record of lands that are within 200 feet of the boundary of the affected land. <br />Notice requirements are specified in Rule 2.2. A copy of a form which includes all <br />required information for the notice has been attached for your use. You will need to <br />~ provide the Division proof of notice prior to the decision date, which may be by <br />submitting return receipts of a certified mailing or by proof of personal service <br />(Rule Z.2.2(6)). <br />NOTE TO COMMENTORS/OBJECTORS: It is likely there will be additions, changes, and <br />~ deletions to this document prior to final decision by the Mined Land Reclamation Board <br />or Division. Therefore, if you have any comments or concerns, you should contact the <br />applicant or the Division prior to the decision date so that you will know what changes <br />may have been made to the application document. <br />The Division is not allowed to consider comments, unless they are written, and received <br />~ prior to the end of the public comment period. You should contact the applicant for the <br />final date of the public comment period. <br />If you have questions about the Mined Land Reclamation Board and Division's review and <br />decision or hearing process, you should contact the Division at (303> 866-3567. <br />• <br />As an authorized representative of the applicant, I hereby certify that the operation <br />described herein has met the minimum requirements of the following terms and conditions: <br />1. This mining operation will not adversely affect the stability of any <br />~ significant, valuable and permanent man-made structure(s) located within two <br />hundred (200) fee of the affected lands. However, where there is an agreement that <br />damage to the structure is be be compensated for by the applicant/operator (C.R.S. <br />34-32-115(4)(d)), then mining may occur within 200 feet. Proof of an agreement <br />must be submitted to the Division prior to the decision date. <br />~ 2. No mining operation will be located on lands where such operations are <br />prohibited by law (C.R.S. 34-32-115(4)(f)); <br />3. As the applicant/operator, I do not have any mining/prospecting operations in <br />the State of Colorado currently in violation of the provisions of the Mined Land <br />Reclamation Act (C.R.S. 34-32-120) as determined through a Board finding. <br />• <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.