My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110035
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:06:58 PM
Creation date
11/24/2007 7:27:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992038
IBM Index Class Name
Permit File
Doc Name
COVER SHEET SAND CREEK MINE REVISED MLRB 112 PERMIT APPLICATION ADAMS CNTY COLO 05/1992
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />-3- <br /> (riverbottom) <br /> 10. Primary future Cropland(CR) X Pastureland(PL) General Agriculture(GA) <br /> _ <br />(Post-mining) Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />• _ <br />land use Residential(RS) _ <br />Recreation(RC) _ <br />Industrial/Commercial(IC) <br /> (check one>: _ Developed Water Resources(WR) _ Solid Waste Disposal(WD) <br /> (riverbottom - no grass) <br /> 11. Primary rep sent _ Cropland(CR) X Pastureland(PL) General Agriculture<GA) <br /> land use Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> _ <br />(check one): Residential(RS) _ <br />Recreation(RC) _ <br />Industrial/Commercial(IC> <br />• _ Developed Water Resources(WR) _ <br /> 12. Method of Mining: _ Quarry (Q R) _ Solution (SO) <br /> 12a. Other: Briefly explain mining method (e.g. Placer, truck/shovel). <br /> Truck/Shovel <br />• <br /> 13. On Slte Processing: _ Solut ion (SO) _ Chemic al (CH) _ Thermal (TH) <br /> Wash sand with _ Heap Leach (HL) _ Vat Le ach (VL) <br /> water only. <br /> 14. Application Fee: <br />• The application fee for quarry minin g is $2,325. <br />The application fee for solution mining or any chemical or thermal processing <br />is $3,100. <br />• If none of these methods or processes are to be included in the operation then the <br />application fee is $1,875. <br />An applicant will not be issued a reclamation permit until notified by the Division that <br />~ this application and the required performance and financial warranties have been <br />• approved. Alternatively, an automatic approval will occur where the Division fails to <br />notify the applicant/operator that the application has been denied. The final agency <br />action must be made within 120 calendar days from the date the application was <br />submitted. However, the performance and financial warranties must be approved by the <br />Division or Board before a permit will be issued even if you receive an automatic <br />approval. NO MINING OPERATIONS SHALL BEGIN UNTIL A PERMIT IS ISSUED (Rule 7.2(2)>. <br />• It shall be a rovision of this <br />p permit that the operations will be conducted in <br />accordance with the terms and conditions listed in your application, as well as with the <br />provisions of the Act and the Mineral Rules and Regulations in effect at the time the <br />permit is issued. <br />• <br />• <br />i• <br />
The URL can be used to link to this page
Your browser does not support the video tag.